Prufrock
In service · 2021The Boring Company's machine built to dig tunnels fast and cheap.
Prufrock is The Boring Company's own all-electric tunnel boring machine (TBM), the giant cylindrical drill that grinds out a tunnel and lines it with concrete as it moves forward. The company designed it from scratch to replace Godot, the secondhand machine that dug its first tunnel in Hawthorne, California, and Prufrock machines now dig the Loop tunnels under Las Vegas and Nashville.
What is Prufrock?
Prufrock is a family of machines that The Boring Company builds in Bastrop, Texas. In September 2025 the company called Prufrock-4 its smartest, fastest, and safest TBM, with Prufrock-5, -6, and -7 under construction in Texas. On October 14, 2026, Prufrock-5 arrived at Morgan's Inclusion Campus in San Antonio, where it will dig a 0.8-mile tunnel across the campus once final permits are approved, the company's first tunnel in San Antonio. A hard-rock version, Prufrock-MB, is cutting through limestone for the Music City Loop in Nashville. On March 9, 2026, Prufrock-2 finished the company's longest drive, a 2.28-mile tunnel near Westgate Las Vegas, after moving about 68,000 cubic yards of dirt.
Why Prufrock Exists
Elon Musk founded The Boring Company in December 2016 to “solve the problem of soul-destroying traffic,” and the obstacle was the speed and price of tunneling. The company blames two habits of conventional machines. Crews spend weeks digging a launch pit before the first foot of tunnel exists, and soft-soil machines mine about 5 feet, stop to set the concrete lining, and start again. Prufrock was designed to remove both.
Something is stirring beneath @WestgateVegas Prufrock-1 has begun porpoising upwards towards the surface. No retrieval pit required! https://t.co/JHDh1EL6a5
— The Boring Company (@boringcompany) See the post on X
How it Works
Three features set Prufrock apart. Porpoising lets it tilt down from a truck and dive into the ground within about 24 hours, with no pit and no giant crane, then surface again at the far end. Continuous mining sets the precast concrete lining while the cutting head keeps digging. Zero-People-in-Tunnel (ZPIT) means nobody works underground during normal digging: the machine runs from an operations control center, which the company calls the safest, fastest, and least expensive way to tunnel. On its record drive, Prufrock-2 sent dirt back along about 4.8 miles of conveyor belt driven by six motors totaling 825 horsepower.

The Economics of Prufrock
The Boring Company says Prufrock is aiming for 1 mile of tunnel a week at an all-in cost under $5 million a mile for a Loop tunnel. That pairing is the business case: tunnels cheap and fast enough to sell at a profit instead of being built one at a time as public megaprojects. The company's April 2022 Series C raised $675 million at a $5.675 billion valuation, partly to speed up Prufrock development, and its Series D raised $3 billion on September 9, 2026 at a $23 billion valuation.
Current Status of Prufrock
Prufrock machines dig the newer Las Vegas tunnels. Prufrock-1 surfaced beneath Westgate in November 2023 with no retrieval pit, and Prufrock-3 finished its first Las Vegas tunnel in September 2024. The Boring Company says it has built more than 10 miles of tunnel in Las Vegas, where the Vegas Loop has carried more than 4 million passengers through 14 stations. Clark County and the City of Las Vegas have approved 68 miles of tunnel in all.

What Comes Next
The model is leaving Nevada. In Nashville, where the Tennessee Department of Transportation issued the Music City Loop's tunnel permit on February 25, 2026, Prufrock-MB1 and Prufrock-MB2 were both digging by October, Prufrock-MB3 was set to launch in late October, and Prufrock-MB4 was being built. The company wants four machines underground there by the end of 2026, on a route meant to bring the airport within about 10 minutes of Lower Broadway. In Dubai, The Boring Company has signed a construction contract with the Roads and Transport Authority (RTA) for a pilot Loop of 6.4 kilometers and four stations, linking the Dubai International Financial Centre to Dubai Mall.
Prufrock-3 Breakthrough! 12 weeks after completing the Cybertunnel at Giga Texas, Prufrock-3 has completed its first tunnel in Las Vegas! Next Prufrock-3 launch (after upgrading several systems to the Prufrock-4 spec), scheduled for October 30. https://t.co/ywEM7S8XJD
— The Boring Company (@boringcompany) See the post on X
The Bottom Line
Prufrock is Elon's bet that tunneling can become fast and cheap enough to make dense underground transit pay. The $5 million a mile figure is the company's target, and the machines are adding stations in Las Vegas and digging under Nashville.
Timeline
- 2022 April 20: The Boring Company announces a $675 million Series C at a $5.675 billion valuation, partly to speed up Prufrock development.
- 2023 November: Prufrock-1 porpoises up to the surface beneath Westgate Las Vegas, with no retrieval pit.
- 2024 September: Prufrock-3 completes its first tunnel in Las Vegas, 12 weeks after finishing the Cybertunnel at Giga Texas.
- 2025 September: The Boring Company calls Prufrock-4 its smartest, fastest, and safest TBM, with Prufrock-5, -6, and -7 under construction in Texas.
- 2026 February 25: Tennessee issues the Music City Loop tunnel permit, and by April 1 Prufrock-MB1 is tunneling in Nashville.
- 2026 March 9: Prufrock-2 emerges after a 2.28-mile drive near Westgate, the longest Vegas Loop tunnel dug in one push.
- 2026 September 9: The Boring Company raises $3 billion in a Series D at a $23 billion valuation.
- 2026 October 1: Prufrock-MB1 and Prufrock-MB2 are digging in Nashville, and Prufrock-MB3 is set to launch in late October.
- 2026 October 14: Prufrock-5 arrives at Morgan's Inclusion Campus, San Antonio, for a 0.8-mile campus tunnel, with work to begin after final permits.
Sources (13)
- The Boring Company: Prufrock
- The Boring Company: Projects
- The Boring Company: Vegas Loop
- The Boring Company: Music City Loop and FAQ
- The Boring Company: Music City Loop update, October 1, 2026
- The Boring Company: Series C
- The Boring Company: Series D, September 9, 2026
- The Boring Company on X: Prufrock-4 is its smartest, fastest, and safest TBM (September 2025)
- The Boring Company on X: Prufrock-2 finishes a 2.28-mile drive (March 9, 2026)
- The Boring Company on X: Prufrock-1 porpoises up beneath Westgate (November 2023)
- The Boring Company on X: Prufrock-3 completes its first Las Vegas tunnel (September 2024)
- The Boring Company on X: Prufrock-5 arrives in San Antonio (October 14, 2026)
- The Boring Company on X: its first tunnel in San Antonio (October 16, 2026)